Indra Mahendra Sukardi, and Agung W. Biantoro. “Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review”. Engineering And Technology Journal 10, no. 3 (March 10, 2025): 4021–4026. Accessed September 28, 2026. https://www.everant.org/index.php/etj/article/view/1796.