Siregar, S., Jayady, A. and Pribadi, K. S. (2026) “Assessing the Effectiveness of Procurement Risk Mitigation on Cost, Quality, And Schedule Performance in Industrial Construction Projects”, Engineering And Technology Journal, 11(06), pp. 10755–10760. doi: 10.47191/etj/v11i06.50.