Siregar, S., Jayady, A., & Pribadi, K. S. (2026). Assessing the Effectiveness of Procurement Risk Mitigation on Cost, Quality, And Schedule Performance in Industrial Construction Projects. Engineering And Technology Journal, 11(06), 10755–10760. https://doi.org/10.47191/etj/v11i06.50