[1]
Prio Anggoro, B. et al. 2025. Operational Risk Management in Precast Concrete Manufacturing: Lessons from The Probowangi Plant Indonesia. Engineering And Technology Journal. 10, 8 (Aug. 2025), 6074–6077. DOI:https://doi.org/10.47191/etj/v10i08.05.