Significant Risks Affecting Quality Performance in Road Widening Projects: Evidence from A Probability–Impact Matrix Analysis
Downloads
Ensuring quality performance in road widening projects remains a significant challenge due to various risks encountered during construction. This study aims to identify significant quality-related risks in road widening projects using a Probability–Impact Matrix (PIM). The research is based on a case study of the Taktakan–Gunung Sari–Anyer road widening project in Banten Province, Indonesia. Risks were identified through interviews with experienced practitioners and a review of relevant literature, followed by expert validation. Nine risks were evaluated in terms of probability and impact using expert judgment and mapped using the PIM. The results reveal three dominant risks with very high significance: material supply delays, equipment breakdown, and material price escalation. These risks indicate that quality performance is strongly affected by operational and procurement-related issues during construction. The study highlights the practical usefulness of PIM as a straightforward and transparent tool for prioritizing quality risks in road projects. The findings provide practical guidance for improving quality risk management in road widening projects, particularly in developing country contexts.
Asaa, O. A. (2025). Risk analysis in construction projects using probability–impact matrix: Concepts, applications, and limitations. Innovative Infrastructure Solutions, 10(1), Article 79.
Hillson, D., & Murray-Webster, R. (2017). Understanding and managing risk attitude (3rd ed.). Routledge.
Ibironke, O. T. (2013). Framework for risk management in the delivery of road infrastructure in Nigeria. International Journal of Construction Engineering and Management, 2(3), 75–85.
ISO. (2018). ISO 31000:2018 – Risk management: Guidelines. International Organization for Standardization.
Jayady, A., & Rajagukguk, S. T. (2024). Optimizing project delivery in educational infrastructure: The impact of fast-track methods in Indonesian school construction. Enrichment: Journal of Multidisciplinary Research and Development, 2(4), 134–139.
Kassem, K. M., & Hamzah, A. R. (2019). Developing a model for construction project risk prioritization based on Delphi–PIM approach. International Journal of Construction Management, 19(4), 343–356.
Nyoman, S. (2019). Pengelolaan risiko yang mempengaruhi kinerja mutu pada pelaksanaan proyek jalan Ciamis–Banjar–Pangandaran–Batas Jawa Tengah. Techno-Socio Ekonomika, 12(2), 101–109.
Papua, M., Jayady, A., & Nurjaman, H. N. (2025). Risk assessment on the Jalintim preservation PPP project in Riau Province: PJPK and BUP perception. Enrichment: Journal of Multidisciplinary Research and Development, 3(7), 3184–3189.
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® Guide) (7th ed.). PMI.
Purnomo, C., & Jayady, A. (2023). The North Line Jakarta LRT: Operating system and risk analysis. Enrichment: Journal of Multidisciplinary Research and Development, 1(6), 250–256
Willar, D., Trigunarsyah, B., Dewi, A. A. D. P., & Makalew, F. (2023). Evaluating quality management of road construction projects: A Delphi study. The TQM Journal, 35(3), 626–644.
Zhasmukhambetova, A., Evdorides, H., & Davies, R. (2020). Risk assessment and scheduling techniques in highway construction: A systematic review. Infrastructures, 5(3), 85.