Why Contracts Fail: Financial Risk Factors in Urban Pedestrian Bridge Construction in Indonesia
Downloads
Contract termination in public infrastructure projects reflects a failure not only in performance but also in early risk management. This study investigates the dominant risk factors that led to the contract termination of two pedestrian bridge (JPO) construction projects in Jakarta, Indonesia: the North-East Jakarta bridges. Adopting a qualitative case study approach, the research applies the risk management framework of ISO 31000:2018, integrating Ishikawa diagrams and the Probability Impact Matrix (PIM) to identify, validate, and analyze critical risks. Data were collected through literature review, field interviews, and structured questionnaires with key stakeholders, including project owners, contractors, and consultants. A total of 60 risk variables were initially identified, of which 24 were validated by experts. The PIM analysis revealed that three risk factors—irregular payment for materials, poor financial management, and insufficient execution funds—fell within the high-risk zone. All three were categorized under financial risk, highlighting the central role of financial preparedness in project continuity. These findings are consistent with prior studies emphasizing finance as a recurrent cause of project underperformance. Response strategies were formulated through expert consultation and include strengthening contract clauses related to payment, improving contractors’ financial evaluation during tendering, and deploying financial management systems on-site. The study offers practical recommendations for public agencies and contractors to mitigate financial risks and reduce the likelihood of contract termination in future projects. It also contributes to the growing body of knowledge on risk management in public construction projects in emerging economies
Cross, D. O., & Abbas, U. I. (2019). Project failure and its influence on the performance of construction firms in Nigeria. International Journal of Research in Busineabdulss, Economics and Management, 3(2), 86–95.
Fatayer, F. A., Issa, A. Z., Abunemeh, M., & Dwikat, M. A. M. (2022). Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), 2577–2598.
Greenwood, T., & Howarth, D. (2018). Construction quality management: Principles and practice. Routledge.
Greenwood, T., & Howarth, D. (2018). Construction Quality Management: Principles and Practice (2nd ed.). Routledge.
Henni, H., Pramestari, D., Dinariana, D., Suryani, F., Sujatini, S., & Arby, A. I. (2024). Development of supply chain risk mitigation to develop an effective strategy for small and medium enterprises. Logistic and Operation Management Research (LOMR), 3(1), 17–27. https://doi.org/10.31098/lomr.v3i1.1553
International Organization for Standardization. (2019). ISO 31010:2019 Risk management — Risk assessment techniques. https://www.iso.org/standard/72140.html
ISO. (2018). ISO 31000:2018 Risk management – Guidelines. International Organization for Standardization.
ISO. (2019). ISO 31010:2019 – Risk management – Risk assessment techniques. International Organization for Standardization.
Jayady, A., & Moerdianto, E. (2022). Risk management of time control on the construction of Saumlaki Port. Indonesian Journal of Multidisciplinary Science, 1(12), 1581–1597.
Jayady, A., & Moerdianto, E. (2022). Risk management of time control on the construction of Saumlaki Port. Indonesian Journal of Multidisciplinary Science, 1(12), 1581–1597. https://doi.org/10.55324/ijoms.v1i12.239
Kassem, A., Khoiry, M. A., & Hamzah, N. (2019). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14(3), 527–546.
Kassem, A., Khoiry, M. A., & Hamzah, N. (2019). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14(3), 527–546. https://doi.org/10.1108/IJESM-03-2019-0011
Muhammad, N. Z., Keyvanfar, A., Majid, M. Z. A., Oloke, D. A., & Shafiei, M. W. M. (2022). Assessment of cost escalation factors for building and civil engineering projects in Nigerian construction industry: A multiple regression approach. *Jurnal Teknologi (Sciences & Engineering), 84*(1), 67–78.