Analysis of Risk Factors Influencing Time and Quality Performance in Multi-Storey Building Projects
Downloads
In today's global era, the construction industry is experiencing rapid growth, though its implementation often encounters challenges related to time, cost, and quality. Project implementation in construction is frequently delayed, often due to a shortage of labor or the absence of necessary equipment on site. This study aims to identify the risk factors that influence project implementation time and the quality of project performance. This study combines quantitative and qualitative descriptive research approaches that utilize numerical data and are subject to statistical analysis. The methodology applied in this high-rise construction research includes journal-based literature reviews, expert opinions, and data gathered through interviews and questionnaires. For analyzing the data, the research makes use of Structural Equation Modeling through the SmartPLS application. The results and discussion of the study will explain the process and results of the research conducted by the researcher. The results of the study show risk factors that affect contractor performance on high-rise building construction projects, namely: terms of reference, inappropriate field planners, inappropriate mobilization of tools and labor, inappropriate working drawings and inadequate licensing identification. The results of the study also show that contractor performance has a positive and significant effect on time and quality performance in building construction projects. The risk factors of contractor performance that have an effect on quality and time on the performance of high-rise building construction projects are: inadequate workforce skills, availability of equipment on site, late payments to subcontractors, experience of field managers/supervisors and shortage of workers.
Abd El-Karim, MSBA, Mosa El Nawawy, OA, & Abdel-Alim, AM (2017). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13(2), 202–216.
https://doi.org/10.1016/j.hbrcj.2015.05.001
An American National Standard. (2008). A Guide To The Project Management Body of Knowledge (PMBOK Guide) (Fourth Edi). Project Management Institute, Inc.
Haryono, S. (2016). SEM Method for Management Research with AMOS, LISREL, Smart PLS. Journal of Physics A: Mathematical and Theoretical, 450.
Hawari, K. (2009). Project Risk Identification in the Construction Phase of 4-20 Storey Buildings in Jabotabek from a Contractor’s Perspective. 1, 1–129.
Kamal, A., Abas, M., Khan, D., & Azfar, R.W. (2022). Risk factors influencing the building projects in Pakistan: from the perspective of contractors, clients, and consultants. International Journal of Construction Management, 22(6), 1141–1157. https://doi.org/10.1080/15623599.2019.1683693
Lin, C.L., & Chen, B.K. (2021). Research for risk management of construction projects in Taiwan. Sustainability (Switzerland), 13(4), 1–15. https://doi.org/10.3390/su13042034
Mas'ud, F., Mursidi, B., Darmawan, LOR, & Rustan, FR (2023). Analysis of Time and Cost Risk Management in the Construction Project of the Type D Regional Public Hospital in Kendari City. STABILITA || Scientific Journal of Civil Engineering, 11(3), 122.
https://doi.org/10.55679/jts.v11i3.43080
Sarstedt, M., Ringle, C. M., & Hair, J. F. (2020). Handbook of Market Research. In Handbook of Market Research (September Issue).
https://doi.org/10.1007/978-3-319-05542-8
Sinaga, L. (2024). Analysis of the green retrofit concept according to the guidelines of the Minister of Public Works and Public Housing Regulation No. 21 of 2021 on chemical industry buildings based on blockchain-BIM for cost efficiency. Lastarida Sinaga’s thesis NIM:... 21.
https://doi.org/10.13140/RG.2.2.17159.82085
Situmorang, BE, Arsjad, TT, Tjakra, J., Sipil, T., Sam, U., Manado, R., Manado, JKB, & Ratulangi, S. (2018). Risk Analysis of Building Construction Project Implementation. Tekno, 16(69), 31–36.
Sutikno, S., Husin, AE, & Yuliati, MME (2022). PLS-SEM will analyse the criteria for the optimum cost of green MICE projects in Indonesia based on value engineering and lifecycle cost analysis. Archives of Civil Engineering, 68(4), 555–570.
https://doi.org/10.24425/ace.2022.143054
Tri Wizaksono, B., & Waty, M. (2023). Risk Analysis of the Bumi Slipi Mandiri IT Development Project. JMTS: Jurnal Mitra Teknik Sipil, 6(4), 885–898. https://doi.org/10.24912/jmts.v6i4.24917