Al-rikab, Dr. Naji Shayeb. “Integration Value Engineering With Target Costs into the Design and Development Stage from the Product Lifecycle A Case Study of the Electronic Industries Company – Baghdad”. Account and Financial Management Journal 7, no. 9 (September 29, 2022): 2929–2939. Accessed September 28, 2026. http://www.everant.org/index.php/afmjh/article/view/718.